Constructing long leaders

Post Options Post Options   Likes (0) Likes(0)   Quote ThomasW Quote  Post ReplyReply Direct Link To This Post Topic: Constructing long leaders
    Posted: 06 Apr 2014 at 9:34pm
ThomasW View Drop Down
Titanium
Titanium
Avatar

Joined: 03 Dec 2005
Location: Byelorussian SSR
Status: Offline
Points: 6349
I have always used fairly short leaders/tippets, probably 10-12ft.  Today, because the fish were so flighty I experimented with a leader/tippet closer to 20ft.  It was much easier to cast then I imagined, resulted in no lost flies, I normally lose a few and only a couple of tangles with the vegetation behind... the last two might have just been luck, but I have gained confidence that it helped me trick a few extra wary trout.  For some reason I never really comprehended the advice to use long leaders on spooky fish until today.... 

So my question...

What is a good ratio between leader and tippet....  My current leader probably started its life at 9ft, I shorted it a bit, extended it maybe a foot or two with heavier nylon, tied on a micro ring and historically 2-3 feet of tippet.  

Now I am probably tying 10+ feet of tippet to the micro ring and was wondering wither its out of balance.. Should I use a longer tapered leader or is it okay to have 10ft of tippet tied to the end?

So what is a good ratio to be using?  
Back to Top
Post Options Post Options   Likes (0) Likes(0)   Quote Rainbow Quote  Post ReplyReply Direct Link To This Post Posted: 07 Apr 2014 at 11:49pm
Rainbow View Drop Down
Topic Moderator
Topic Moderator


Joined: 27 Jul 2005
Status: Offline
Points: 3315
There is no "one" answer.   In fact there are so many fishing situations  that the best way to start is to ask yourself what do you want to achieve with your leader set up?    Then construct a leader that will do that?  
Rainbow  
Back to Top
Forum Jump
Forum Permissions View Drop Down


This page was generated in 0.309 seconds.

Fishing Reports Visit Reports

Freshwater Fishing Reports
Canterbury Fishing Report - 23/07/26

Lake fishing strong July is close to an end, our duck season is closing this... Read More >

24 Jul 2026
Saltwater Fishing Reports
Northland Fishing Report - 23/07/26

Inshore snapper fishing heating up It’s officially past the halfway point of winter, and the... Read More >

23 Jul 2026
Saltwater Fishing Reports
Bream Bay Fishing Report - 23/07/26

Winter kahawai abound  Kahawai and kingfish have ‘invaded’ Bream Bay over the last few weeks,... Read More >

23 Jul 2026
Saltwater Fishing Reports
Inner Hauraki Gulf Fishing Report - 23/07/26

Choose a spot and stick with it Why the chill factor of the wind affects... Read More >

23 Jul 2026
Saltwater Fishing Reports
Outer Hauraki Gulf Fishing Report 23/07/26

Options Galore at Great Barrier The outlook for this weekend looks pretty dire for heading... Read More >

23 Jul 2026
Saltwater Fishing Reports
Raglan Fishing Report - 23/07/26

Fat snapper in 70-80m The excellent winter snapper fishing continues out wide in 70-80m. These... Read More >

23 Jul 2026
Fishing bite times Fishing bite times

Major Bites

Minor Bites

Major Bites

Minor Bites