<?xml version="1.0" encoding="utf-8" ?>
<?xml-stylesheet type="text/xsl" href="RSS_xslt_style.asp" version="1.0" ?>
<rss version="2.0" xmlns:WebWizForums="https://syndication.webwiz.net/rss_namespace/">
 <channel>
  <title>The Fishing Website : Discussion Forums : Constructing long leaders</title>
  <link>https://www.fishing.net.nz/forum/</link>
  <description><![CDATA[This is an XML content feed of; The Fishing Website : Discussion Forums : Freshwater Fission : Constructing long leaders]]></description>
  <pubDate>Sun, 02 Aug 2026 13:20:19 +0000</pubDate>
  <lastBuildDate>Mon, 07 Apr 2014 23:49:59 +0000</lastBuildDate>
  <docs>http://blogs.law.harvard.edu/tech/rss</docs>
  <generator>Web Wiz Forums 12.01</generator>
  <ttl>360</ttl>
  <WebWizForums:feedURL>https://www.fishing.net.nz/forum/RSS_post_feed.asp?TID=100191</WebWizForums:feedURL>
  <image>
   <title><![CDATA[The Fishing Website : Discussion Forums]]></title>
   <url>https://www.fishing.net.nz/forum/forum_images/web_wiz_forums.png</url>
   <link>https://www.fishing.net.nz/forum/</link>
  </image>
  <item>
   <title><![CDATA[Constructing long leaders :  There is no &amp;#034;one&amp;#034;...]]></title>
   <link>https://www.fishing.net.nz/forum/forum_posts.asp?TID=100191&amp;PID=1435755&amp;title=constructing-long-leaders#1435755</link>
   <description>
    <![CDATA[<strong>Author:</strong> <a href="https://www.fishing.net.nz/forum/member_profile.asp?PF=48923">Rainbow</a><br /><strong>Subject:</strong> 100191<br /><strong>Posted:</strong> 07 Apr 2014 at 11:49pm<br /><br />There is no "one" answer.&nbsp;&nbsp;&nbsp;In fact there&nbsp;are so many&nbsp;fishing situations &nbsp;that the best way to start is to ask yourself what do you want to achieve with your leader set up?&nbsp;&nbsp;&nbsp; Then construct&nbsp;a leader that will do that?&nbsp;&nbsp;<div></div>Rainbow&nbsp;&nbsp; ]]>
   </description>
   <pubDate>Mon, 07 Apr 2014 23:49:59 +0000</pubDate>
   <guid isPermaLink="true">https://www.fishing.net.nz/forum/forum_posts.asp?TID=100191&amp;PID=1435755&amp;title=constructing-long-leaders#1435755</guid>
  </item> 
  <item>
   <title><![CDATA[Constructing long leaders : I have always used fairly short...]]></title>
   <link>https://www.fishing.net.nz/forum/forum_posts.asp?TID=100191&amp;PID=1435313&amp;title=constructing-long-leaders#1435313</link>
   <description>
    <![CDATA[<strong>Author:</strong> <a href="https://www.fishing.net.nz/forum/member_profile.asp?PF=42288">ThomasW</a><br /><strong>Subject:</strong> 100191<br /><strong>Posted:</strong> 06 Apr 2014 at 9:34pm<br /><br />I have always used fairly short leaders/tippets, probably 10-12ft. &nbsp;Today, because the fish were so flighty I experimented with a leader/tippet closer to 20ft. &nbsp;It was much easier to cast then I imagined, resulted in no lost flies, I normally lose a few and only a couple of tangles with the vegetation behind... the last two might have just been luck, but I have gained confidence that it helped me trick a few extra wary trout. &nbsp;For some reason I never really comprehended the advice to use long leaders on spooky fish until today....&nbsp;<div><br></div><div>So my question...</div><div><br></div><div>What is a good ratio between leader and tippet.... &nbsp;My current leader probably started its life at 9ft, I shorted it a bit, extended it maybe a foot or two with heavier nylon, tied on a micro ring and historically 2-3 feet of tippet. &nbsp;</div><div><br></div><div>Now I am probably tying 10+ feet of tippet to the micro ring and was wondering wither its out of balance.. Should I use a longer tapered leader or is it okay to have 10ft of tippet tied to the end?</div><div><br></div><div>So what is a good ratio to be using? &nbsp;</div>]]>
   </description>
   <pubDate>Sun, 06 Apr 2014 21:34:52 +0000</pubDate>
   <guid isPermaLink="true">https://www.fishing.net.nz/forum/forum_posts.asp?TID=100191&amp;PID=1435313&amp;title=constructing-long-leaders#1435313</guid>
  </item> 
 </channel>
</rss>